Our Manufacturing Process
Different stages in a Black CTC teas factory processing.
Green Leaf at Centres
![[photo] - tea factory process](images/tea-factory-process-01.jpg)
Offloading at Factory
![[photo] - tea factory process](images/tea-factory-process-02.jpg)
![[photo] - tea factory process](images/tea-factory-process-03.jpg)
Green leaf received at the factory, offloaded from trucks and taken into withering section
Withering Troughs
![[photo] - tea factory process](images/tea-factory-process-04.jpg)
![[photo] - tea factory process](images/tea-factory-process-05.jpg)
Green leaf spread on troughs
- Hot air applied to hasten withering process
- Takes 8 -16hrs
- Target is reduction of leaf moisture content to below 70%
Rotorvane & CTC Section
![[photo] - tea factory process](images/tea-factory-process-06.jpg)
![[photo] - tea factory process](images/tea-factory-process-08.jpg)
The withered leaf is macerated by the rotorvane then cut by the CTC machines.
Oxidation Section
![[photo] - tea factory process](images/tea-factory-process-09.jpg)
![[photo] - tea factory process](images/tea-factory-process-10.jpg)
Installed with Continuous Fermentation Units (CFU). Leaf color changes from green to copperly bright.
Drying Section
![[photo] - tea factory process](images/tea-factory-process-11.jpg)
![[photo] - tea factory process](images/tea-factory-process-12.jpg)
- Reduces Moisture content to below 5%
- Achieves the black tea
Sorting Section
![[photo] - tea factory process](images/tea-factory-process-13.jpg)
![[photo] - tea factory process](images/tea-factory-process-14.jpg)
![[photo] - tea factory process](images/tea-factory-process-15.jpg)
![[photo] - tea factory process](images/tea-factory-process-16.jpg)
- Pre-sorters – removes fibres
- Winnower extracts fluff
- Final sorters – Sort the teas to different grades i.e BP1, PF1, PD, DUST1, DUST.
Bulking And Parking
![[photo] - tea factory process](images/tea-factory-process-17.jpg)
Packing/ Bulking And Despatch.